Foundations and Trucks
These pictures are in reverse order. It started with the big "hose" truck that had a vacuum type elephant nose that sucked up the concrete from the other truck. The "hose" then went over the house to the back, where the concrete was laid in for the foundation. Then after a couple days, the block layers came in to put up the block wall. This area will be the crawl space under the addition.
The "hose" had concrete in it, which was laid in between the boards for the footings for the block wall.
Sunday, September 6, 2009
Isaac's Tree, Windows, Doors
Subscribe to: