Saturday, October 10, 2009

House Update, 10-10-09

This is the crawl space, i.e. about 5 feet in the ground with poly (platic) and pea rock as the base. We will not use this for anything, other than a location for the small furnace and duct work for this area. We will access it throught the existing basement window.


They now have the floor joists and base floor in place.

They put up the exterior walls on Krisanne's birthday, October 8th! An open roof will extend to the left of the new wall (i.e. where the existing patio door is). You can see the kitchen window above the sink is now boarded up.


This is part of the expanded dining room. The two new windows you see will be the same as the windows in the living room (the one living room window is shown on right hand side of the picture).