They now have the floor joists and base floor in place.
Saturday, October 10, 2009
House Update, 10-10-09
This is the crawl space, i.e. about 5 feet in the ground with poly (platic) and pea rock as the base. We will not use this for anything, other than a location for the small furnace and duct work for this area. We will access it throught the existing basement window.

They now have the floor joists and base floor in place.
They now have the floor joists and base floor in place.
Saturday, September 19, 2009
Foundations and Trucks
These pictures are in reverse order. It started with the big "hose" truck that had a vacuum type elephant nose that sucked up the concrete from the other truck. The "hose" then went over the house to the back, where the concrete was laid in for the foundation. Then after a couple days, the block layers came in to put up the block wall. This area will be the crawl space under the addition.
The "hose" had concrete in it, which was laid in between the boards for the footings for the block wall.
Sunday, September 6, 2009
Isaac's Tree, Windows, Doors
Saturday, August 15, 2009
Sunday, August 9, 2009
Subscribe to:
Posts (Atom)